Barclays has substantially rewritten its building-safety instructions for conveyancers, with more detailed requirements concerning qualifying leases, remediation funding, borrower contributions and the evidence needed before submitting a Certificate of Title.
The change, dated 23 November 2026, concerns Part 2 answer 5.14.17b of the UK Finance Mortgage Lenders’ Handbook. It appears in Barclays Bank UK PLC’s England and Wales instructions, although the statutory leaseholder-protection provisions discussed concern buildings in England.
For firms handling an affected purchase or remortgage, this calls for a review of the live file. A familiar EWS1 rating or a general assurance that remediation will be funded may leave important requirements unanswered.
Which transactions does the revised answer address?
The opening wording identifies purchases and remortgages of leasehold flats in a “relevant building” under the Building Safety Act 2022. It also states that the section does not apply where there are no relevant defects and/or a satisfactory EWS1 form exists.
That scope needs establishing before applying the detailed requirements. Conveyancers should identify the building, the defects, the available external-wall evidence and the ownership arrangements, then read the complete answer alongside Part 1 and the mortgage offer.
The statutory definition of a relevant building is explained in the government’s relevant-building guidance. Building height alone does not answer every question about the protections available.
What does Barclays say about EWS1 ratings?
The revised answer identifies A1, A2 and B1 as satisfactory EWS1 ratings. Properties rated A3 or B2 require the further checks described in the instructions.
It also states that an EWS1 is not required for buildings constructed after 1 January 2020, while requiring the conveyancer to ensure that planning and building regulation approvals are in place.
These are Barclays’ stated requirements. An EWS1 is not a general building-safety guarantee, and its rating should not be treated as resolving every question about defects, expenditure or the borrower’s legal position.
Barclays also instructs conveyancers not to send unsolicited copies of a Fire Risk Assessment or FRAEW. Obtaining and assessing relevant information, retaining evidence and sending documents to the bank are separate tasks.
A3 and B2 properties: qualifying status and confirmed funding matter
For properties requiring the further checks, the revised wording states that Barclays will not provide a mortgage where the current owner does not own a qualifying lease and/or the building lacks confirmed remediation funding through a developer, government or housing association.
The practical questions therefore extend beyond whether somebody has accepted responsibility for investigating the building.
- Has the lease’s qualifying status been established?
- Who has committed to fund the remediation?
- What works and associated costs does that commitment cover?
- What written evidence supports the funding position?
- Could any material costs fall on the borrower?
An application for funding, an expression of intention or an informal update from a managing agent should not be assumed to meet a requirement for written confirmation.
Different funding routes require different evidence
The revised answer distinguishes three routes:
| Funding route | Evidence described in the revised instructions |
|---|---|
| Developer | Written confirmation from a developer that has entered a UK Government contract to complete the works and meet all associated costs. The conveyancer must carry out the necessary checks. |
| Housing association | Written confirmation that the property will be fully remediated, with no costs passed to the leaseholder. |
| Government | Written confirmation from the relevant government department that the property has been approved for funding. |
For these funding confirmations, Barclays says copies are not required unless specifically requested. That does not remove the obligation to obtain and check the evidence.
The revised answer requires documentation to be retained on file and supplied on request.
Leaseholder-owned buildings: clarify the application of the wording
The revised answer includes an express statement that Barclays will not lend on a leaseholder-owned building, described as one where the freehold is solely owned by the building’s tenants.
This needs careful reading in context. The statement sits within an answer whose opening wording limits its application by reference to relevant buildings, relevant defects and satisfactory EWS1 evidence.
Government guidance also explains that leaseholder-owned buildings are excluded from the relevant-building definition used for the statutory leaseholder protections. The interaction between that exclusion and Barclays’ wording should be clarified where it affects a transaction.
It would therefore be unsafe to turn this paragraph into a blanket statement that every share-of-freehold flat is unacceptable to Barclays. Establish the actual ownership structure and seek the bank’s written clarification where the application of the instruction is uncertain.
Membership of a residents’ management company does not, by itself, establish ownership of the freehold. Our article on share of freehold and building-safety costs explains why that distinction matters.
Borrower contributions must be explained and reported where required
Where leaseholders must contribute towards remediation, Barclays requires material matters, including associated financial liabilities, to be referred for review and incorporated into the affordability assessment.
The expected cost to the customer and anticipated payment timeline must be clearly detailed.
The borrower must also receive clear advice about their obligations, potential contributions and the possible effect on a future sale or remortgage. A lender’s willingness to proceed does not replace that advice.
Where costs remain uncertain, the report should explain the uncertainty and its implications. A broad statement that funding exists may conceal exclusions, additional expenditure or unresolved responsibility.
Certificate and lease checks remain central
The revised wording requires a Leaseholder Deed of Certificate before completion to confirm qualifying status, supported by appropriate evidence. The conveyancer must check its completion and consistency with the lease and relevant title information.
The instructions also address lease terms and dates, the identity information recorded in certificates and the consistency of any Landlord’s Certificate with the lease.
Several checks appeared in the previous answer and have been retained or reorganised. Firms should review the replacement answer as a whole rather than assume that every paragraph introduces a new obligation.
Other requirements include:
- Requesting any Remediation Order or Remediation Contribution Order that has been obtained and supplying a copy to Barclays.
- Checking an unknown pre-14 February 2022 sale price against Land Registry records where the stated circumstances require it.
- Reporting identified inaccuracies in remediation paperwork before completion or submission of the Certificate of Title, as directed.
- Evidencing the applicable remediation scheme and the supporting confirmations.
The revised answer places responsibility on the conveyancer to ensure its requirements have been met before submitting the Certificate of Title.
What should firms do with affected live files?
- Identify affected matters: review Barclays purchases and remortgages involving leasehold flats and building-safety issues.
- Establish scope: record the building’s status, relevant defects, EWS1 position and ownership arrangements.
- Check funding evidence: compare the actual documents with the requirements for the relevant funding route.
- Identify borrower exposure: establish potential contributions, timing and matters requiring lender review.
- Resolve inconsistencies: obtain clarification where documents or instructions leave a material question unanswered.
- Update the borrower: explain the findings and any unresolved financial or resale implications before commitment.
- Record the review: retain the instruction version, evidence, referrals and responses supporting the decision to proceed.
Use LENDERmonitor to follow Barclays’ instruction changes
This revision illustrates why checking the Handbook when a file opens may be insufficient for a transaction that continues over several weeks or months.
The Barclays Part 2 policy-history page on LENDERmonitor provides a route into its recorded amendment history. Firms should use change information to prompt a review of the full applicable instructions and affected files.
Our earlier analysis of a decade of Barclays Handbook changes shows how requirements have developed across building safety, leasehold lending and other conveyancing issues.
Why the historical Barclays wording matters
If a completed transaction later becomes the subject of a complaint, audit or professional indemnity investigation, the relevant question is what the lender required at the material time. The November 2026 wording should not simply be applied retrospectively to an earlier file.
The Barclays Lender Archive helps identify the historical Part 2 record for a selected date. Read it alongside the applicable Part 1 instructions, mortgage offer, specific lender correspondence and conveyancing file.
That evidence can help distinguish a later policy change from an instruction that already applied. It does not, by itself, establish negligence or liability.
For owners whose sale or remortgage has exposed a building-safety issue they did not understand when buying, When I Bought’s cladding and building-safety guide explains the documents and earlier advice worth investigating.
What did Barclays require when the transaction completed?
Reviewing an earlier Barclays conveyancing file? Establish the historical lender instructions before assessing the advice, reporting or checks undertaken.
Select the completion date in the Lexsure Lender Archive and confirm that the lender record matches the mortgage documentation. Other material dates may also require investigation.
Published on 24 November 2026. This article summarises the Barclays Part 2 comparison dated 23 November 2026. Check the complete current instructions and obtain lender clarification where necessary before acting on a live transaction.